The challenge was to complete a full specification for Cheltenham Racecourse, delivered in time for the prestigious 2016 Open, while enabling a continued full race programme during redevelopment.
This exciting project at Flitwick leisure centre was successfully delivered into the local community. The access and flow requirements of the public building needed to be fully considered during the design phase and a total solution was required for inter…