Cheltenham Racecourse
The challenge was to complete a full specification for Cheltenham Racecourse, delivered in time for the prestigious 2016 Open, while enabling a continued full race programme during redevelopment.
Project Specification Group supplied steel external and security doors alongside internal timber security doors over a 19-month delivery period, ensuring safe but unhindered access and flow around the busy racecourse.
Download the full case study here.